4000-ton full-slewing heavy lift vessel.
Scope of business:
Installation of oil jackets and modules.
Installation of large-diameter single-pile foundations.
Installation of wind power jackets and wind turbines.
Installation of step-up station jackets and modules.
Delivery: 2023 China
Classification: CCS
Positioning: 8-point anchor mooring, non-DP
Length: 182 m.
Breadth: 49 m.
Depth: 15 m.
Operating draft: 11 m.
Designed draft: 8 m.
Deck load: 12 t/m2.
Accommodation: 138 persons.
Endurance: 30 days worldwide.
Main Equipment Main hook: 4000 t at 30–40 m, fixed.
Auxiliary hook: 3000 t at 30–40 m, full slewing.
Rigging hooks: 2 sets, 1000 t / -10 to 145 m.
Tugger winches: 2 sets, 20 t and 40 t.
Maximum lifting height: -10 to 116.5 m.
Power System Main generator diesel sets: 1500 kW × 4.
Harbor generator set: 700 kW × 1.
Emergency generator: 300 kW × 1.
Main electrical system: 690 V / 50 Hz.
Harbor and emergency electrical systems: 400 V / 50 Hz.
Location China.